LEIYUAN INDUSTRIAL COMPANY LIMITED

Plastic Paddock Flooring Grid Installation

2016-06-18

Plastic Paddock Flooring Grid Installation Guide

1. Clean the ground

Clean the ground

 

2. Lay the whole area out and align

Lay the whole area out and align

 

3. Lock in safety interlocking system

Lock in safety interlocking system

 

4. All sections are securely connected

All sections are securely connected

 

5. Immdiately ready for load-bearing

Immdiately ready for load-bearing

 

6. Filling the surface

Filling the surface

 

7. Sand delivery directly on the surface

Sand delivery directly on the surface

 

8. Distribution of the sand by machine

Distribution of the sand by machine

 

NextRainwater Harvesting Modular Installation

Message